Coaches
Monday 6 September 2010
 

No.7 Tumblehome.

No7. Tumblehome Coach.

This coach is identical with No.6 and many parts of its construction were carried out at the same time as No.6, but it was finally completed in September 2008.

Some minor improvements were made during construction from lessons learnt from the build of No.6, also No.7 has been fitted with lighting.

Carriage side under construction Partially constructed carriage

A fully built side panel dries after being painted in primer and the side panel fixed in place on the chassis.